Case study · Trade show rigging

IAA Mobility, Munich

Brand worlds under the hall ceiling: at IAA Mobility in Munich, lighting, video and scenery hang above the booths of the biggest mobility brands, planned and hung by our crew.

Back to homepage
EventIAA Mobility
LocationMesse München
TradeTrade show rigging · Planning & crew
ScopeLoad-in to load-out
Rigging crew during load-out at IAA Mobility in Munich

The brief

Trade show rigging is precision work in the rhythm of exhibition logistics: at IAA Mobility, complete brand worlds are built in just a few days, with lighting ceilings, LED walls and truss structures that have to match the booth architecture exactly. Every hall has its own rigging grid, load limits and approval processes, and the build runs parallel to dozens of other trades.

What that demands from us: planning agreed with the venue and the booth builders before the first day of the build, and a crew that performs reliably in the load-in as well as the load-out.

The execution

SilverBones planned the rigging points, calculated the loads and executed the work with its own crew: trusses, chain hoists and rigging gear from certified stock, installed within the windows of the exhibition schedule and documented for approval. During load-out, one thing counts above all: speed, without letting the care slip.

The result

Booths that stood ready on opening day and a de-rig that stayed on schedule. Trade show rigging the way it should be: invisible to visitors, dependable for the production.

Next project

Planning a trade show appearance?

From rigging-point planning to the load-out crew: we know how the big exhibition venues work. We usually reply within 24 hours.

Request a project
Request a crew